Terry from ANGRMS reports:
Over the weekend of the 9th and 10th of August, the 100th non-wooden (concrete or steel) sleeper was installed on our main line. These new sleepers should last much longer than the wooden ones and reduce our maintenance burden in the long term, something that is always important with a volunteer led organisation.
Well done on the long term planning!